The Board of Directors of Binh Duong Water Environment Joint Stock Company approved to sign agreements with Biwase Electric Construction Joint Stock Company with the following details:
1) Installing the automatic control system at Pumping Station Level I of Uyen Hung Water Plant and Dat Cuoc Pumping Station. Expected time in August 2021.
2) Installing the level I pump and level 2 leaking chlorine treatment system for Chon Thanh water plant. Expected time in September 2021.
3) Warehouse 2 and canteen – Complex Water Supply Branch. Expected time in August 2021.